Nintex K2 5.10 arrives as 5.9.1 support ends 31 December: NZ checks

By DataForge team27 November 20265 min read

Nintex's K2 5.10 imports old SharePoint Designer workflows and keeps local AI, and K2 5.9.1 loses standard support on 31 December 2026.

What Nintex released

Nintex released K2 5.10, the latest version of its on-premises automation platform, on 24 November (US time). The Nintex product blog says the update is available now to all K2 customers through Nintex Customer Central, and partners get it through Partner Central. Most of the changes concern SharePoint. K2 5.10 can import SharePoint Designer 2010 and 2013 workflows, adds workflow events for Document Sets, passes SharePoint workflow event context through for more precise routing, and includes a SharePoint App Manager that checks environment health and configuration before a project goes too far.

The rest of the release covers integration and housekeeping. SmartObjects, the K2 layer that connects forms and workflows to other systems, now take JSON properties with nested data from modern APIs. Developers can also run count, top, grouping and where queries inside K2 Designer, so they need fewer database stored procedures. K2 components no longer need .NET Framework 3.5, Oracle compatibility has been updated, and there's accessibility work aimed at WCAG 2.1. K2 Intelligence, the locally hosted AI that arrived in 5.9.1, carries over and offers summarisation, sentiment analysis, severity analysis and language detection.

The iTWire release and IT Brief Australia both describe the release as aimed at regulated organisations that want to keep processes and data on their own infrastructure. Nintex hasn't published pricing changes or customer numbers with the release.

The date K2 owners need to watch

The Nintex support and release strategy page gives the release's more urgent detail. K2 5.9.1, which came out on 29 April 2026, is a short-term release. Standard support for 5.9.1 ends on 31 December 2026 and extended support ends on 31 March 2027. K2 5.10 gets standard support until 30 November 2028 and extended support until 30 November 2030. K2 5.9, the release before 5.9.1, stays in standard support until 31 December 2027.

The same page explains what the stages mean. During standard support, customers with an active support agreement get new code fixes. Once standard support ends, Nintex stops developing new code fixes except for crucial production outages, while security, stability and performance release packs continue until extended support ends. K2 5.8 left standard support on 30 September 2026. Organisations that took 5.9.1 for the local AI features now have about five weeks left of full support on 5.9.1. Planning an upgrade over the Christmas shutdown is tight for most NZ IT teams.

Why the SharePoint features matter now

SharePoint Designer workflow import matters because Microsoft has spent 2026 withdrawing the platforms those workflows run on. Microsoft's SharePoint 2013 workflow retirement notice says SharePoint 2013 workflows were removed from existing SharePoint Online tenants on 2 April 2026 with no option to extend. After a tenant's workflows are turned off, they can only be viewed as raw XML. On premises, Microsoft's 2026 end of support list shows SharePoint Server 2016, SharePoint Server 2019, SharePoint Designer 2013 and InfoPath 2013 all reached end of support on 14 July 2026. Microsoft's retirement notice adds that SharePoint Server Subscription Edition stopped supporting 2010-based workflows on the same date, while 2013-based workflows continue on Subscription Edition.

Plenty of NZ organisations still run approval chains, leave requests, purchase orders or compliance forms built in SharePoint Designer a decade ago. Some of those workflows are on servers that no longer receive security updates. Others sit in tenants where the workflow engine has already been switched off. Microsoft's own recommendation is Power Automate, and the retirement notice lists third-party workflow engines as an option. The notice also warns owners of third-party engines to check whether those products depend on SharePoint 2013 workflow underneath. K2 5.10 competes for the organisations that would rather keep the logic on their own servers than rebuild it in Microsoft's cloud.

What it means for NZ organisations

The release raises different questions depending on where an organisation stands. A council, health provider or financial services firm that already runs K2 should first confirm which K2 version is in production. The second question is whether staff have started using K2 Intelligence actions in live workflows. Anyone on 5.9.1 has a support deadline in five weeks, and anyone on 5.8 is already past standard support.

For organisations with stranded SharePoint Designer workflows, workflow import is useful, but Nintex's material doesn't say how much of a workflow converts cleanly. The blog promises reduced migration effort without giving a conversion rate. Custom actions, InfoPath forms and hard-coded site URLs are the parts of old SharePoint workflows that tend to need hand work in any migration, so we'd expect testing against real workflows to tell a business more than the feature list does. InfoPath support ended on the same July date, so any workflow that depends on an InfoPath form has two problems to solve.

The local AI features suit organisations with data residency obligations. When summarisation and sentiment scoring run inside K2 on the customer's own servers, customer complaints and case notes never leave the building. Local AI still needs governance. Someone has to decide which workflows may route or prioritise work based on an AI severity score, and how a person can override a wrong score. Organisations weighing private AI more broadly can read our notes on running AI on your own infrastructure.

Practical next steps

  • Check the K2 version on every server, test environments included, against the Nintex lifecycle table, and book the 5.10 upgrade before 31 December 2026 if any server runs 5.9.1.
  • Read the 5.10 release notes on help.nintex.com for breaking changes before upgrading. Removing the .NET 3.5 requirement is welcome, but custom components built against older frameworks need a regression test.
  • Run Microsoft's Microsoft 365 Assessment tool and its Power BI workflow report to list every SharePoint 2010 and 2013 workflow that's still running, with usage data, before choosing a migration target.
  • Pick three or four representative SharePoint Designer workflows, including one with custom actions, and trial the K2 5.10 import on them. Record how much manual rework each one needed.
  • Compare K2, Power Automate and a rebuild on cost, support horizon and where the data lives, then decide per workflow. A single blanket decision rarely suits a mixed estate.
  • Before turning on K2 Intelligence actions, write down which decisions AI scores may influence, who reviews them, and how staff can override a score.

Organisations that want help sorting through a legacy workflow estate can see how we approach process and automation work.

Want to know what this means for your organisation? Our team in Auckland can show you your top three opportunities in a free 30 minute assessment.

Get my free assessment How we help
Get new articles by RSS